No.
Project description
Year
1
Transportationof generators, equipment, cables, pipes, irregularly shape equipment from location to location – ports to locations inside Iraq
2021
2
Transportation of drilling pipes from various locations to the drilling well locations – using Cranes 80, 40-ton capacity -tucks 18,26,40,60, during rig moves and from the port to the company locations
2019
3
Transportation of 5 & 3 Megawatts generators from Basra ports to company location in Basra
2019
4
Transportation of fully equipped camp from Baghdad to Basra including caravans, generators, T-walls, motor industrial equipment