Feed and engineering

Feed and engineering

No.

Project description

Year

1

Provide Required Construction Staff.

2020

2

Inspection of 3 main Oil Heaters and 2 Storage Tanks

2021

3

Manpower Recruitment Services for Civil engineers .

2019

4

Supply GFC with Various types valves

2021

5

Supply GFC with Cylinder Tanks , 80 Ltr Capacity

2021

6

Manpower Recruitment Services for Construction Activities.

2021

7

Supply Cat Generators Materials and Spare parts

2021

8

Operation & Maintenance Services

2020

9

Manpower Recruitment Services for Iraqi Candidates

2018

10

Supply of Emerson Flow Meters

2018

11

Supply of Fuel Gas Metering System With Calibrated Coriolis Flow Meters

2019

12

Fabrication and chemical processing services for water tank – West Qurna Basra Iraq

2019

13

Civil and piping works for offloading area in south Ghazalat and Civil
work for south Ghazalat EPF

2019

14

Supply , Fabrication , Laying , Welding & Erection of Different Sizes
of carbon steel piping

2019

15

Supply material for Construct Pipeline 12″ in Petroleum Harbor (1,2)and (3,4) -3rd stage

2019

16

Supply Pump and spares for our Project in Badra

2019

17

Supply of Catalyst materials

2019

18

Supply of Battery cars and spares, Model EG2029K

2019

19

Supply of Ruthmann Crawler Articulated Boom Platform

2019

20

Supply of drilling equipment

2019

21

Supply of Forklift spares

2018

22

Supply of Electrical equipment (Sensors and Detectors)

2018

23

Supply of LEISTRZSCH PUMP

2018

24

Repair of Benzine Pipe line at Tank 23 in El Max

2018

25

Installation of sandwich panel

2018

26

Construction of Base Camp in Badra

2017

27

E&I construction activities Meleiha power generation system upgrading

2017

28

Civil and Electromechanical works for pressure reduction station

2017

29

Tank bottom and roof coating and external painting services at WQ1, Basra, Iraq

2017

30

Supply of Screw Pump (FLOWSERV)

2017

31

Supply of CATERPILLAR Forklift, Model DP70-100NH

2017

32

Fabrication and Installation of Fixed Roof Tank

2017

33

Supply of spare parts for Al Zubair Oil field (5 years
contract)

2016

34

Pre-commissioning, commissioning and Startup
for 16” pipeline Zubir – Naseria 200KM

2016

35

Piping work for IOL train no. 3 and 4 Iraq Zubair North New DGS Project

2016

36

Tank construction in West Qurna-2 field

2016

37

Tank work at Iraq Zubair North New DGS Project

2016

38

Electrical Works for rehabilitation of Heating cables in sector” E “

2016

39

Fabrication and installation of firefighting network in port said Tank

2015

40

Construction for Tank (1000m3)& maintenance works for oil tank and firefighting network of El-Max tank

2015

41

Maintenance of Two storage tanks 500 BBL capacity of each one ( PR 06/05/No.11/2014 A.F.)

2014

42

design, supply, fabrication & installation of 32″ brackish water
pipeline

2014

43

Electrical Works for Fence Lighting

2014